The weather is turning a little and rain is forecast for the rest of the week. This is very much needed but means outside jobs are on hold now until after we come back from our 10 days in UK. Our last job before the rain was to finish wrapping the garage in its breathable membrane to protect the OSB.
As you can see all doors and windows are now in as well, so the garage is watertight and secure. The next job is to paint the floor (as once everything is in there it will never get done), render the concrete blocks at the bottom and batton and clad the outside. Then we should be able to move our boxes out of storage and the tools out of the house!
A blog about living in rural France, and currently surviving through the coronavirus times.
Tuesday, 10 April 2012
Subscribe to:
Post Comments (Atom)
Be more dog
I'm always grateful that we have our dogs. We had never been dog owners up until our move but it had been something that we both wanted ...
-
The prompt for Sepia Saturday this week is of a couple around a piano. It is an upright piano and similar to the one owned ...
-
This picture is taken from the begining (or end) of the South Downs overlooking Eastbourne. It was a Sunday afternoon and it shows kids and...
-
This photograph was in my mother's collection. All the other photos were carefully named but this one had a question mark by it. ...
3 comments:
You shame me with the speed at which you're getting things done!
Well we're not working at anything else!
Cladding is taking a little longer than expected, but we'll be there shortly - then it's the screed and under floor heating.
Post a Comment